Label Paper Permanent Critical Pathway 2 1/4"x7/8" Fl. Green 1000 per Roll
Part #
59704589
LABEL PAPER PERMANENT CRITICAL PATHWAY 2 1/4" X 7/8" FL. GREEN 1000 PER ROLL
Log in for contract pricing
$43.65
Label Paper Permanent Critical Pathway 2 1/4"x7/8" Fl. Green 1000 per Roll is available to buy in increments of 1
LABEL PAPER PERMANENT CRITICAL PATHWAY 2 1/4" X 7/8" FL. GREEN 1000 PER ROLL
Units | 1000 |
---|---|
Material | Paper |
Width | 2-1/4 |
Color | Fluorescent Green |
Unit of Measurement | Roll |
Wound | Side First/Right-handed person/Outside |
Size | 2-1/4" x 7/8" |